Kosdown Goes Solar
Kosdown have continued to embrace sustainability and innovation with a large scale Solar installation to the Kosdown factory in Port Melbourne. The installation comprises a 62kW photo voltaic roof panel system, together with a Three Phase 50Kwp Inverter.
Kosdown have long been committed to sustainability and the environment, with water-less Computer to Plate printing and Forest Stewardship Certified paper use. The opportunity to extend this commitment to a significant solar installation has produced further gains in reduced energy consumption, and savings in energy costs. The system was commissioned in late march 2020 and has already achieved a Carbon Offset over 100 metric tons in nine months of operation. This is the equivalent effect of planting 20 acres of forest.
“The solar installation was something we have planned for years, and now with the technology available, we have been able to install a cutting edge system, we couldn’t be more impressed with both the energy savings and the cost savings.”